Project Cargo

Where most forwarders stop, we start.

Oversized, indivisible and multi-origin, project cargo is the work most forwarders avoid. Acura plans, sequences and executes complex shipments end to end, with a single point of coordination.

What we handle for this industry

  • Route surveys and lift planning
  • Flat-rack, open-top and breakbulk
  • Transshipment and consolidation
  • Delivery sequencing to site
  • Dedicated project management

What counts as project cargo?

Project cargo is the equipment and material shipped to build, expand or repair a facility, such as a power plant, a substation or a factory. It usually combines oversized or very heavy pieces, known as out of gauge (OOG) cargo, with general cargo from several suppliers that has to reach the same site in a set order. The whole shipment runs on the construction schedule: if one piece arrives late, installation stops.

Acura has moved combined-cycle plant components and power project cargo into the Bahamas and the Caribbean.

Which equipment fits which piece?

It comes down to dimensions, weight per piece and how the cargo can be lifted or rolled. For reference, a standard 40-foot dry container measures roughly 12.03 m (39 ft 6 in) long, 2.35 m (7 ft 8 in) wide and 2.39 m (7 ft 10 in) high inside, and the door opening is slightly smaller, about 2.34 m (7 ft 8 in) wide and 2.28 m (7 ft 6 in) high.

Equipment or mode When it is used What limits it
Standard container (20 or 40 ft) Pieces that fit through the door, spare parts and project materials Inside and door dimensions; maximum weight for the container and the roads
Open top Tall pieces, or pieces that can only be loaded from above by crane Container width and length; anything above the top is charged as out of gauge
Flat rack Pieces wider or taller than a container, such as transformers or tanks Flat rack weight limit; overwidth and overheight take up neighboring slots on the vessel and are charged
Breakbulk Pieces too large for a flat rack, loaded one by one in the hold or on deck Fewer vessels on many routes; more handling
Heavy lift Pieces heavier than the port's regular cranes can handle Ship's gear or available mobile cranes; quay load capacity
Ro-ro Self-propelled machinery or cargo on rolling platforms The port needs a ramp and ro-ro service; height and axle weight

When a piece is close to the limit of any of these options, the call belongs to a lift engineer working from the weight and center of gravity confirmed by the manufacturer.

What should you know about the destination port before you quote?

Many ports in the Caribbean and Latin America are small. Confirm:

  • Draft at the berth and in the approach channel.
  • Available cranes: shore cranes, mobile cranes that can be hired, or whether the vessel needs its own gear.
  • Laydown and maneuvering space to discharge the piece and hold it for inland transport.
  • Road access to the site: bridges, overhead clearances, turns, power lines and weight limits.

That last point is checked with a route survey. Sometimes it costs less to discharge at a different port than to modify the route.

Which documents and permits are usually required?

They vary by country and equipment, but most shipments need:

  • Commercial invoice and a packing list with the dimensions and weight of every piece.
  • Bill of lading.
  • Drawings showing lifting points, center of gravity and the lashing plan.
  • For exports from the United States, Electronic Export Information (EEI) filed in AES when the value per Schedule B number exceeds USD 2,500 or the goods require a license.
  • Oversize permits from every state or country the cargo crosses by road.
  • At destination, import permits, temporary import regimes or project tax exemptions.

Talk to a customs broker in the destination country before the cargo sails, especially if the equipment travels disassembled in several pieces or the project has tax incentives.

How is the delivery sequence to site built?

The sequence follows the installation schedule: first what gets installed first, such as anchor bolts and steel structures; then the main equipment; last, spares and consumables. Each delivery is coordinated with the crane and the crew on site.

If the site has nowhere to receive cargo, it waits at the port or in a warehouse, and those days cost money. With several suppliers, a freight forwarder can consolidate in Miami or Houston and ship in batches that match the installation order.

What information should you have ready to request a quote?

  • Length, width and height of every piece.
  • Weight per piece, not just the total.
  • Lifting points and center of gravity.
  • Manufacturer drawings or data sheets.
  • Pickup location and exact delivery address.
  • Date the piece will be ready at the factory and required on-site date.
  • Incoterm and cargo value.

A few centimeters or inches can change the equipment needed or trigger an additional permit.

Frequently asked questions

What is the difference between out of gauge and heavy lift?

Out of gauge cargo exceeds the dimensions of a container; heavy lift cargo exceeds the weight that regular handling equipment can take. The same piece can be both.

Can project cargo move by air?

Yes, if the piece fits in a freighter aircraft or on a charter flight. It costs far more, so it is usually kept for critical spare parts.

Who prepares the lift plan?

A lift engineer or the rigging contractor, using the manufacturer's data. The forwarder gathers that information and coordinates it with the port, the vessel and the trucking company.

How early should project logistics planning start?

As soon as the dimensions of the piece and its manufacturing date are known. Route surveys, permits and booking specialized vessels all take time.